Boring Middle School will receive numerous improvements and repairs. These fixes will improve the environment for students with air conditioning, and addition to the school, allowing for the removal of portable classrooms.
Highlights:
- Add Air Conditioning
- Repair / Replace Roofing
- Classroom and Main Entry Additions
- Remove Portable Classrooms
- Renovated Science Rooms
Breakdown by Category:
- Repair / Replace Exterior Masonry + Wood Siding
- Repair / Replace Single Pane Windows
- Minor Repair at Exterior Doors, Hardware, Access Controls
- Repair / Replace Roofing
- Repair Structure Under Gym Floor
- Minor Repair at Interior Doors, Hardware
- Repair / Replace Floor Finishes
- Repair / Replace Ceiling Finishes
- Renovate Three (3) Existing Science Classrooms
- Renovate Admin for Classroom
- Upgrade Domestic Water Distribution, Fixtures
- Replace Indoor Heating Ventilator/ Air Handler
- Replace Rooftop / Split System Units
- Upgrade HVAC Controls, Testing and Balancing
- Upgrade Electrical Service + Distribution
- Add Air Conditioning Where Not Currently Provided (All Except Music Addition)
- Repair Fire Alarm System
- Replace Intercom / Paging System
- Add Covered Play Area
- Repair Roadways, Parking Lots, Walkways
- Repair / Replace Site Lighting
- Add new Entry, Admin, RRs, Classroom
- Add Two (2) General Education Classrooms
- Upgrade Art Equipment
- Demo Maintenance, Concessions Buildings
- Demo Two (2) Portable Buildings
- Renovate Gym Ancillary Spaces for Specialists
- Add Fence and Gates at Former Main Entry
